Storage Material

Bicarbonate

Size, m3

80

Storage Material

Coal | Bicarbonate | Ash

Size, m3

60 | 80 | 200

Storage Material

Cement

Size, m3

22

Storage Material

Talc

Size, m3

112

Storage Material

Coal | Bicarbonate

Size, m3

2 x 40

Storage Material

Hydrated Lime

Size, m3

90

Storage Material

Ash

Size, m3

111

Storage Material

Hydrated Lime

Size, m3

80

Short Desription

In this project, qoncept carried out a feasibility study for the implementation of an automatic multi-media coupling system designed to replace manual hose connections for gas and hydraulics in a steel plant environment. The study focused on evaluating technical feasibility, defining installation requirements, and identifying optimal system positioning through detailed collision and layout analyses. It also included the basic engineering for piping and pipe routing on ladles and transfer cars, as well as the design of custom brackets, guiding systems, and protective components. Two on-site assessments were conducted to verify boundary conditions and refine the installation concept in close collaboration with plant engineers. The resulting study provides the technical basis for the subsequent detailed engineering and installation of a fully automated coupling solution, aimed at increasing operator safety, reducing connection time, and enhancing process reliability